Last Updated
18 November 2021
Published on
18 November 2021
Last update: 15/11/2021
Subsystem | Status/Trend | |||||
---|---|---|---|---|---|---|
Service Module | AOCS | Power | DHSA | |||
COMMS | Housekeeping | |||||
Thermal | PMCIF | |||||
Payload Module | PMC | TCU | PCU | |||
PDU | RTU | FMU | ||||
SSR | XBS | NIU | ||||
HRPT | Off | LRPT | Off | |||
Instrument | ASCAT | Off | MHS | ADCS | Off | |
AMSU-A1 | GRAS | SARR | Off | |||
AMSU-A2 | GOME | SARP | Off | |||
HIRS | IASI | |||||
AVHRR | SEM |
Footnotes
ADCS | 2021-11-15: A-DCS off |
AMSU-A1 | 2009-12-01: H7 declared failed. 2013-07-15: H3 NEDT out of spec (0.4 K) 2016-04-18: H8 declared failed. |
ASCAT-ICU | 2021-11-15: ASCAT-ICU off |
ASCAT | 2021-11-15: ASCAT off |
COMMS | 2011-06-23: Transponder A output power TM decreased |
GOME | 2012-09-22: throughput loss in UV stabilised with limited performance degradations |
FMU | 2019-08-03: FMU on B-side after PL_SOL_7 |
HIRS | 2015-11-20: H10 out of specification limit 2016-02-23: H10 back in specification 2016-07-14: H5 and H10 out of specification limit 2016-11-23: H1, H2, H4, H5, H6, H9, and H10 out of specification limit 2017-01-30: H1 - H12 out of specification limit 2017-04-29: All channels out of specification limit apart from H19 2018-11-29: All channels out of specification limit |
SEM | 2019-05-17: TED Electron CDEM bias voltage at level 7, which is the maximum. 2021-08-02 Proton CDEM bias voltage at level 7, which is the maximum. |
PMC | 2011-10-22: PMC on B-side after PL-SOL_06 |
IASI | 2015-04-09: IMS swap to b-side 2015-10-07: CD permanently stopped |
SARR | 2021-11-11: SARR Receiver and Transmitter on B-Side 2021-11-15: SARR off |
SARP | 2021-11-15: SARP off |
MHS | 2011-12-06: Local oscillator swap improved H3/4 NEDT, but trend continues 2014-03-01: H3/H4 further degrading but NEDT still within spec 2014-10-23: H3/H4 stable and improving 2016-12-06: Local oscillator swap improved H2 NEDT 2020-02-26: H2 declared failed 2021-02-22: swap to PIE-B after LO5 thermistor failure |
HRPT | 2011-01-18: HRPT-B unit in restricted operation. Complete longitudinal coverage zone active (No transmission at higher latitudes in both hemispheres) 2013-05-16: Switching changed from modulation to SSPA 2020-03-02: Switching changed from SSPA to modulation 2021-11-15: HRPT-B off |
LRPT | 2007-01-26: switched-off because of HIRS interferences |